Chart Pro Issue

Forum Home Forums Understanding the Software Chart Pro Issue

Tagged: 

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #17739
    kelvin33
    Participant

    I had configured Min Archive logging interval from 1min to 3min. However when I upload the configuration and view the chart, it shows only dot instead of line. Is there any setting that I need to modify in the PlgChartPro.xml.
    Pls advise. Thanks.

    • This topic was modified 8 hours, 31 minutes ago by Mikhail.
    #17742
    Mikhail
    Moderator

    Hello,
    Set the GapBetweenPoints parameter in the PlgChartPro.xml file.
    This is a number of seconds to draw a line between points.

    • This reply was modified 8 hours, 29 minutes ago by Mikhail.
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.