Hello!
I am interested in the possibility of a Rapid SCADA following graphic visualizations
1 thermometer, and that the band would correspond to the real DATA
2 fan rotation when the real ventilyato work and do not rotate when the real is not working
3 pointer speedometer
and in general how to do in Rapid SCADA visualization with the movement?
Thank you in advance!
P.S. If this topic already raised give the link