Evgen
Participanthttps://yadi.sk/i/hUuFKJH8knDRW
Here screen problemsEvgen
ParticipantGive your email I will send
Evgen
ParticipantWhen you open the page Rapid SCADA mimic long time to boot, sometimes up to a minute.
there is a way to speed up the loading
a problem with your computer or network is excluded, local enterprise sites loaded quicklyEvgen
ParticipantHello!
I have a question again. If you load long cargo and mimic podvisat is how to solve this trouble?Evgen
ParticipantHello!
I have a question again . How do the following , there is a current sensor (for example) and you want to within a second track it on, off and currents that go beyond the upper and lower limits ? And what would the data in the events to be displayed for example.Evgen
ParticipantЗдравствуйте!
У меня опять вопрос. Как сделать следующее, есть датчик тока(к примеру) и необходимо с точностью до секунды отслеживать его включение, выключение и токи которые выходят за нижнее и верхнее ограничения? И что бы эти данные выводились в событиях к примеру.Evgen
ParticipantThank you!
If management wants will order this component.Evgen
ParticipantHello!
I have another question.
How to display a single chart several variables?
Here are examples of such plots.
https://yadi.sk/i/IT3dTZrikZtqk
https://yadi.sk/i/lJXuDFtvkZtriEvgen
ParticipantHello!
I am interested in the possibility of a Rapid SCADA following graphic visualizations
1 thermometer, and that the band would correspond to the real DATA
2 fan rotation when the real ventilyato work and do not rotate when the real is not working
3 pointer speedometer
and in general how to do in Rapid SCADA visualization with the movement?
Thank you in advance!P.S. If this topic already raised give the link
Evgen
ParticipantThanks I figured, everything just need a close look
Evgen
ParticipantI have a question again.
How to make that sign (Figure) changes from “Works” to “not working”
IRDP condition x> 0 (Works) x = 0 (not working)
the editor of schemes, I’m interested in how to implement it!Evgen
ParticipantI have a question again.
How to make that sign (Figure) changes from “closed” to “closed”
under the condition x> 0 (Works) x = 0 (not working)Evgen
ParticipantHello!
I have a new question
Now screen
https://yadi.sk/i/IodXoZnzkUtL9
how to make a wider mimic?
Editor schemes stretched the full width of the work area.Здравствуйте!
У меня новый вопрос
вот скрин
https://yadi.sk/i/IodXoZnzkUtL9
как сделать мнемосхему шире?
в редакторе схем растянуто на всю ширину рабочей области.Evgen
Participanthttps://yadi.sk/i/vV9eUHVAkRmW9
Here screen (everything will remain, it is for the operators)
used сodesнs ops and master SCADA
change of color rendering.For perezentatsii will create another visualization
(already drawn left to wait until an engineer when to make the switch, and will pave the cable)but I just do not want to paint all over again. just a lot of areas where you have to leave as is
Evgen
ParticipantThere is visualization. already configured. working. but not through the web browser. and only one computer.
Visualization looks like a color change parameters when they go abroad. the movement of trolleys and their positioning and the like.
How to display a ready-made visualization through RapidSCADAТоже на русском.
Есть визуализация. уже настроена. работает. но не через браузер. а только на 1 компьютере.
Визуализация выглядит так изменение цвета параметров когда они выходят за границы. движение вагонеток и их позиционирование и тому подобное.
Как вывести уже готовую визуализацию через RapidSCADA -